Saturday, November 23, 2024
HomeIndiaUnderwater Metro: PM Modi flags off the first under-water tunnel metro, know...

Underwater Metro: PM Modi flags off the first under-water tunnel metro, know its features

India’s First Underwater Metro: Prime Minister Narendra Modi on Wednesday inaugurated the Howrah Maidan-Esplanade section of the East-West Corridor of Kolkata Metro. This under-water metro tunnel will run between Howrah Maidan-Esplanade section.

India’s First Underwater Metro: Prime Minister Narendra Modi inaugurated the Howrah Maidan-Esplanade section of the East-West Corridor of Kolkata Metro. This under-water metro tunnel will run between Howrah Maidan-Esplanade section. Kolkata Metro Howrah Maidan-Esplanade Tunnel is the first transport tunnel to be built under any river in India. This Howrah metro station is the deepest metro station in India.

Prime Minister Narendra Modi boarded India’s first underwater metro rail in Kolkata. During this he interacted with the students.

Kolkata Metro started in 1984

The first metro operation in India was started in Kolkata in the year 1984. After 18 years, metro operation was started in Delhi in the year 2002. Alok Kumar, Associate Professor of IIM-Calcutta, did a lot of research on Railways. After this the idea was again put forward in the 1980s by the then Railway Minister ABA Ghani Khan Chaudhary. After getting approval by the UPA government in 2008, construction work started in 2009. But the project was delayed due to political constraints and cost overruns.

Underwater metro is part of the East-West Corridor project

India’s first underwater metro service is part of Kolkata’s East-West Corridor Project. The East-West Metro project will connect Sector V to Howrah Maidan on the other side of the Hooghly River. It is being built for Rs 8,600 crore. There is a distance of 4.8 kilometers between Howrah Maidan and Esplanade.

Expected to cover 520 meters distance in 45 seconds

According to a statement issued by Metro Railways, the 4.8 km long stretch of East-West Metro from Howrah Maidan to Esplanade has been built at a cost of Rs 4,965 crore. Of the total 16.6 km of the East-West Metro Corridor, 10.8 km is underground, which also includes the tunnel under the river. The metro train is expected to cover the distance of 520 meters under the river in just 45 seconds.

This tunnel is on the Green Line Metro

The underwater metro route is located on the Green Line of Kolkata Metro which is a 16.6 km long corridor. It connects IT hub Salt Lake Sector 5 in East Kolkata and Howrah Maidan in the West. This route passes through Sealdah and Esplanade. The first phase of this corridor is between Sector 5 and Sealdah. Presently it is operational.

Shyamu Maurya
Shyamu Maurya
Shyamu has done Degree in Fine Arts and has knowledge about bollywood industry. He started writing in 2018. Since then he has been associated with Informalnewz. In case of any complain or feedback, please contact me @informalnewz@gmail.com
RELATED ARTICLES
- Advertisment -

Most Popular

Recent Comments