Vande Bharat sleeper After the successful operation of Vande Bharat trains, now the railways is working on the sleeper version of these trains. The manufacturing process of these trains is almost complete and they will be rolled out of the factory within two months. Initially, they can be operated only on some selected routes, which will be expanded later.
Vande Bharat sleeper: The sleeper version of Vande Bharat will soon start running on the tracks. The first train will leave the factory within two months. The manufacturing process is in its final stages. Initially, there is a plan to bring two sets of trains. They will be trialled first. After that, regular operations will be carried out.
Railway Minister Ashwini Vaishnav has indicated this while talking to journalists on Saturday. Railways is working on the target of running about 250 Vande Bharat sleeper trains in the next five years.
This route can be started
The route has not been decided yet, but it is believed that the Delhi-Mumbai or Delhi-Kolkata route can be started. Under the Atmanirbhar Bharat Abhiyan, the Railway Ministry is working on other versions of Vande Bharat. Each train of the sleeper version will have 16 bogies. There will be 11 AC three bogies, four second AC bogies and one first AC bogie.
Each train will be able to carry 887 people sleeping at a time. The railways are trying to make this train more updated and convenient than the Vande Bharat Express and Rajdhani trains that travel by sitting. The speed capacity of Vande Bharat Sleeper will be 220 to 240 km per hour, but the operating speed will remain 165 km only. Seats with classic wooden design are being made, which will be so comfortable that passengers will feel like in a luxury hotel.
Four crore people traveled in special trains
This time, keeping in view the festival and summer rush, the Railways ran 19 thousand 837 special trains. Railway Minister Ashwini Vaishnav said that these special trains were run during April, May and June in view of the summer rush. More than four crore people traveled in these special trains during three months. This number is in addition to the people traveling in trains daily.