- Advertisement -
Home India New Express Highway: Now the journey of one and a half hour...

New Express Highway: Now the journey of one and a half hour will be completed in 12 minutes, today PM Narendra Modi will lay the foundation

0
New Express Highway: Now the journey of one and a half hour will be completed in 12 minutes, today PM Narendra Modi will lay the foundation

PM Visit To Mumbai- The twin tunnels will pass under the Sanjay Gandhi National Park and will create a direct connection between the Western Express Highway in Borivali and Ghodbunder Road in Thane.

New Delhi. Prime Minister Narendra Modi will inaugurate and lay the foundation stone of several schemes simultaneously in Mumbai, Maharashtra today. These schemes include two twin tunnels between Thane and Borivali as well as BMC’s Goregaon Mulund Link Road. Thane-Boriwali Twin Tunnel is an ambitious project of Mumbai, which was approved by Maharashtra State Road Development Corporation (MSRDC) in 2015. After nine years, work is now starting on it. Prime Minister Narendra Modi will lay the foundation stone of the work by performing Bhoomi Pujan of the tunnel today.

The twin tunnel will pass under the Sanjay Gandhi National Park and will create a direct connection between the Western Express Highway in Borivali and Ghodbunder Road in Thane. Currently there is no direct connection between Thane and Borivali. Thane Ghodbunder Road (SH-42) is a major link road connecting the East West Link. There is heavy traffic on it. The distance from Thane to Borivali is 23 kms via Ghodbunder. During peak hours in the morning and evening, it takes around 1 to 1.5 hours to cover the distance from Thane to Borivali.

The journey will be completed in 12 minutes

The total journey from Thane to Borivali will be reduced by 12 km due to the Borivali-Thane link road. Even a journey of one and a half hours will be completed in just 12 minutes. The total length of the proposed 2+2 lane tunnel is 11.80 km. The diameter of the tunnel is 12.2 meters (2 tunnels, each with 2 lanes). Cross connection lanes will be built every 300 meters in the tunnel. Fire extinguishers/water hoses, smoke detectors, retro reflective/LED lights and sign boards will be installed in the tunnel. Out of the total length of 11.8 km of the tunnel, 8.76 km is in Thane district and 7.4 km in Borivali district.

Approval was given in the year 2015

Maharashtra State Road Development Corporation (MSRDC) approved the proposal to construct a twin tube tunnel between Thane city and Borivali in the 150th meeting of the Board of Directors on 23 September 2015. MSRDC appointed M/s Acom Asia Company Limited as consultant to prepare the DPR for this project on 11.04.2016. In the MMRDA Authority meeting held on 7 July 2020, approval was given to transfer this project from MSRDC to Mumbai Metropolitan Region Development Authority. I had given it.

How much will it cost

In the 154th meeting of MSRDC on March 10, 2023, administrative approval has been given to the estimated construction cost of the project at ₹ 16600.40 crore (including land acquisition). M/s Megha Engineering and Infrastructure Limited (MEIL) will construct this tunnel.

- Advertisement -DISCLAIMER
We have taken all measures to ensure that the information provided in this article and on our social media platform is credible, verified and sourced from other Big media Houses. For any feedback or complaint, reach out to us at informalnewz@gmail.com

Exit mobile version